Description of project

First Floor Addition

Clients reasons/purpose for project

Additional Space

Project Area

80.7 m2

Extra Rooms / Areas Added

  • 1 st Bedroom 4.2 x 3.9m with Walk-in-robe 2.4 x 1.8m
  • Bathroom 3.0 x 3.3m with 1200 x 450mm vanity, 1 x1m shower, bath and toilet
  • 2 nd Bedroom 3.6 x 3.1m with 2 door-robe 1.8 x 0.6m
  • 3 rd Bedroom 3.6 x 3.1m with 2 door-robe 1.8 x 0.6m
  • Linen 1.8 x 0.45
  • TV Room 23.1x 3.0m

Renovations

  • Remove the existing deck and roof sheeting. Provide a new deck 4.8m x 6.5m with ½ deck covered by roof
  • Demolish the centre front bedroom/lounge wall
  • Demolish the centre front bedroom/hall wall
  • Demolish the existing asbestos timber framed laundry/toilet
  • Convert the existing left-hand rear bedroom into a new laundry with external access onto the new deck. Remove existing robe.
  • Remove and Replace the existing roof sheeting over the exiting right hand rear room
  • Convert the existing master bedroom into a theatre room
  • Remove the existing kitchen. New kitchen will be located to the right-hand rear corner.
  • Demolish the kitchen/lounge wall
  • Demolish the kitchen/sunroom wall
  • Remove the hall/kitchen/lounge ceiling and replace with new ceiling
  • Renovate the existing bathroom into a shower room
  • Remove the existing log cabin asbestos cladding and eave sheet. Re-clad all external walls with blue-board sheeting with rendered finish. Install insulation to all these walls.
  • Remove and install six (6) new windows
  • Build a new mezzanine floor to the single garage complete with an attic ladder
  • Remove the rear hinged door and window. Create a larger opening and install two sliding doors to create an open corner.
  • Relocate the existing laundry Hot Water Unit to outside

Finishes / Materials Used

External

  • Roof – Terracotta tiled roof
  • Windows – Aluminium Sliding windows with colonial bars
  • Walls – Cladded blueboard rendered external walls.

Internal

  • Flooring – Pyneboard Flooring
  • Walls/Ceiling – 10mm Gyprock

Inclusions

Preliminaries

Council/Certifier approval, BASIX assessment & certificate, Sydney Water approvals, Engineering and Architectural Drawings.

External

  • Painting

Internal

  • Painting
  • All bathroom fittings and fixtures
  • Door handles/ passage sets
  • Door architraves and skirting
  • AC ducting shafts

Exclusions

Internal

  • Floor coverings, window coverings, solar panels, making good affected flooring, air conditioning and internal painting.

Find out the cost of this project

And get a quote for yours!

CONTACT US NOW

Customer Reviews

REQUEST A QUOTE

Enter your requirements and get a quote for your project

GET A QUOTE NOW

Comments are closed.